Terms And Conditions
The Buyer commits to settling the remaining balance of the total amount through a certified check or money order upon receipt of the goods and confirms receiving a completed version of this purchase order. All deliveries outside the continental U.S. require full payment before shipment, as COD is not an option. This quote does not cover sales tax, import duties, brokerage fees, installation, or anchor bolts. Under no conditions should the driver be given cash for any outstanding balance on the building. The Buyer’s purchase order will only become legally binding once it has been approved in writing by an authorized representative of the Seller. The Project Manager responsible for preparing this order is not an officer of the Seller and cannot accept the order on the Seller’s behalf. If the order is accepted, a signed “Acceptance” copy will be sent back to the Buyer; otherwise, the initial payment will be refunded. Once the order is accepted, the Buyer forfeits the right to claim any refund on the initial payment made to the Seller's Project Manager. In the event of a delay not caused by Surmix Steel, any increases in the price of steel, materials, or shipping after the requested delivery date will be passed on to the Buyer. The Buyer will be notified of such changes via a Change Order, which will outline the revised pricing. The Buyer must either approve the change by signing the Change Order or cancel the contract, though they will still be responsible for any work completed and materials ordered up until the cancellation date. Full terms and conditions can be reviewed at www.surmixsteel.com and are hereby incorporated by reference. Any items not explicitly listed in this proposal, such as foundation design or anchor bolts, are not included in the quoted pricing.
Structural Steel Buildings Terms and Conditions
Warranty Details
14 & 12 GAUGE – A 20-year warranty is provided against rust perforation.
Environmental Exclusions
This limited warranty does not cover the following conditions:
Exposure to chemical agents, fumes, liquids, or solids other than rainfall coming into contact with the product.
Contact with soil, ashes, fertilizers, or other moisture-retaining substances.
Failure to clear debris or ensure proper water drainage, including internal condensation, on all product surfaces.
Damage caused by exposure to green, wet wood, or treated pine.
Installations exposed to highly corrosive environments at any point in the future.
Natural disasters such as storms, tempests, or other acts of nature.
Maintenance Requirements – The surface of the paint must be cleaned annually with mild soap and neutral, clean water. Abrasive materials or chemical cleaners must not be used on the paint surface.
Any modifications or changes made to the structure post-installation will void U.S. Structural Steel’s responsibility for the unit, including its warranty and certification. The building comes with anchor bolts for concrete installation..
CONCRETE DESIGN DISCLOUSURE
The slab and foundation design provided is intended solely for structural use. It does not account for factors such as concrete strength for durability, moisture or vapor barriers, subbase material specifications, installation procedures, or thermal insulation needs. It is recommended to consult a qualified expert for advice on any aspects not covered in this design.
Structural Steel Buildings Terms and Conditions
Warranty Details
14 & 12 GAUGE – A 20-year warranty is provided against rust perforation.
Environmental Exclusions
This limited warranty does not cover the following conditions:
Exposure to chemical agents, fumes, liquids, or solids other than rainfall coming into contact with the product.
Contact with soil, ashes, fertilizers, or other moisture-retaining substances.
Failure to clear debris or ensure proper water drainage, including internal condensation, on all product surfaces.
Damage caused by exposure to green, wet wood, or treated pine.
Installations exposed to highly corrosive environments at any point in the future.
Natural disasters such as storms, tempests, or other acts of nature.
Maintenance Requirements – The surface of the paint must be cleaned annually with mild soap and neutral, clean water. Abrasive materials or chemical cleaners must not be used on the paint surface.
Any modifications or changes made to the structure post-installation will void U.S. Structural Steel’s responsibility for the unit, including its warranty and certification. The building comes with anchor bolts for concrete installation..
CONCRETE DESIGN DISCLOUSURE
The slab and foundation design provided is intended solely for structural use. It does not account for factors such as concrete strength for durability, moisture or vapor barriers, subbase material specifications, installation procedures, or thermal insulation needs. It is recommended to consult a qualified expert for advice on any aspects not covered in this design.